Review of Woodfuel from Hedgerows Group Work Party 1 to
Hedgerow near Crown & Sceptre Pub Newton St Cyres EX5 5DA
.
9 people attended the work party which was led by Rob and Dave.
It was a very productive day with 10 wheelbarrow loads of logs and
kindling produced, all the brash produced from the demo event
processed into kindling and a large area cleared ready for the next
session. A total of 39 manhours (5 project days) was worked.
Work Scope
Site induction and safety talk.
Clear existing material from demo area - This will involve
mostly billhooks to trim the brash - then tie up brash for its
removal - sawing up logs. Sorting, processing and removal of poles.
Carrying material to the road.
Extend the area (not working on the hedge bank) - as above but
initially the area may need clearance with a slasher - most wood
then initially cut with bowsaws and cleared as in previous
paragraph.
An opportunity for people to learn how to work with bowsaws and
billhooks.
Work Party volunteers please read:-
Risk Assessment
Site Induction
Last updated on
by Webmaster
|